语言切换
菜单
语言切换 EN / CN
当前位置: / / /

Recently, the concrete pouring of the lower tank body of the reaction tank in the phosphoric acid plant of the 300,000 t/a MAP project for Zhongda Chemical in Zambia, in which the Sixth Branch of CNCEC-CC6 participated, was successfully completed in a single continuous pour.